Open subscriptions
06/12/2024
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") informs that, in consideration of the ongoing meteo-marine conditions, with the aim to grant the integrity of the plant and safety of operations, the Infra-Annual Subscription Process ‐ First Come First Served criteria, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code, as scheduled for slot 17-19 December 2024, is canceled.
Publication of Regasification Capacity Availability at Adriatic LNG Terminal
|
31/07/2024 Publication of Regasification Capacity Availability at Adriatic LNG Terminal as per Chapter II article 2.4.2 a) of the Regasification Code
Considering the closure of Open Season 2024, Adriatic LNG notifies remaining Available Capacity, starting from January 2029.
Auction Procedures for subscription of Infra-annual Capacity, pursuant to chapter II article 2.4) comma 2 point b) α), of the Regasification Code and of Implementing Auction Rules for Infra-annual Capacity allocation, are suspended up to (i) the eventual release of capacity by a User, if any, (ii) the eventual additional Capacity made available following optimization works subject to operative conditions and relevant authorizations.
The eventual Capacity made available for subscription will be promptly published on the Electronic Communication System.
The Terminal Capacity is determined by considering the technical and operational limits of the Terminal, send-out capacity, Storage capacity, and the available pipeline capacity at the Cavarzere Entry Point known at the date of this publication and taking into account the number and duration of Unloading Slots.
For more details see Article 2.1 of Chapter II of the Regasification Code.
For further clarification do not hesitate to contact us: alng_mercato@adriaticlng.it |
Infra-Annual Subscription TY2023-2024 |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04/12/2024
Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") in order to maximize the use of the LNG regasification service in the interest of the security of the National energy supply and the Gas Market, makes available by means of Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta * The volume proposed is not referred to the capacity of the LNG Ship. The Terminal accepts LNG Ships with a minimum capacity equal to 65,000 lcm, as set forth at Chapter II.1.1. of the Regasification Code. For further information please check our Maritime Services dedicated web area.
26/11/2024
Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") in order to maximize the use of the LNG regasification service in the interest of the security of the National energy supply and the Gas Market, makes available by means of Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta * The volume proposed is not referred to the capacity of the LNG Ship. The Terminal accepts LNG Ships with a minimum capacity equal to 65,000 lcm, as set forth at Chapter II.1.1. of the Regasification Code. For further information please check our Maritime Services dedicated web area.
26/09/2024
Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") in order to maximize the use of the LNG regasification service in the interest of the security of the National energy supply and the Gas Market, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity Available:
Gas redelivery of the slot is scheduled starting from October 1st.
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta * The volume proposed is not referred to the capacity of the LNG Ship. The Terminal accepts LNG Ships with a minimum capacity equal to 65,000 lcm, as set forth at Chapter II.1.1. of the Regasification Code. For further information please check our Maritime Services dedicated web area.
12/08/2024 Following the reclaim as set forth on Chapter II article 2.6 c) of the Regasification Code, Terminale GNL Adriatico informs that slot 19-23 September 2024 is no more available. Infra-Annual Capacity Subscription process scheduled on 14th August 2024 is canceled.
08/08/2024 Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.
Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta.
(1) In order to optimize the utilization of the Terminal Capacity, it is understood that in case of allocation of a volume lower than the maximum available volume offered in the auction procedure, the Operating Company reserves the possibility of reducing the number of hours of the allocated slot (e.g. 120 hours slot reduced to 84 hours for allocated capacity up to 152,000 m3liq) without affecting the duration of the scheduled arrival range as published, considering the operational information available at the time of publication. * The volume proposed is not referred to the capacity of the LNG Ship. The Terminal accepts LNG Ships with a minimum capacity equal to 65,000 lcm, as set forth at Chapter II.1.1. of the Regasification Code. For further information please check our Maritime Services dedicated web area.
05/08/2024 Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.
Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta.
(1) In order to optimize the utilization of the Terminal Capacity, it is understood that in case of allocation of a volume lower than the maximum available volume offered in the auction procedure, the Operating Company reserves the possibility of reducing the number of hours of the allocated slot (e.g. 120 hours slot reduced to 84 hours for allocated capacity up to 152,000 m3liq) without affecting the duration of the scheduled arrival range as published, considering the operational information available at the time of publication. * The volume proposed is not referred to the capacity of the LNG Ship. The Terminal accepts LNG Ships with a minimum capacity equal to 65,000 lcm, as set forth at Chapter II.1.1. of the Regasification Code. For further information please check our Maritime Services dedicated web area.
31/07/2024 Following the reclaim as set forth on Chapter II article 2.6 c) of the Regasification Code, Terminale GNL Adriatico informs that slot 22-26 August 2024 is no more available. Infra-Annual Capacity Subscription process scheduled on 5th August 2024 is canceled.
29/07/2024 Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.
Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta.
(1) In order to optimize the utilization of the Terminal Capacity, it is understood that in case of allocation of a volume lower than the maximum available volume offered in the auction procedure, the Operating Company reserves the possibility of reducing the number of hours of the allocated slot (e.g. 120 hours slot reduced to 84 hours for allocated capacity up to 152,000 m3liq) without affecting the duration of the scheduled arrival range as published, considering the operational information available at the time of publication.
24/07/2024 Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.
Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta.
(1) In order to optimize the utilization of the Terminal Capacity, it is understood that in case of allocation of a volume lower than the maximum available volume offered in the auction procedure, the Operating Company reserves the possibility of reducing the number of hours of the allocated slot (e.g. 120 hours slot reduced to 84 hours for allocated capacity up to 152,000 m3liq) without affecting the duration of the scheduled arrival range as published, considering the operational information available at the time of publication.
18/07/2024 Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code(2) and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.
Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta.
(1) In order to optimize the utilization of the Terminal Capacity, it is understood that in case of allocation of a volume lower than the maximum available volume offered in the auction procedure, the Operating Company reserves the possibility of reducing the number of hours of the allocated slot (e.g. 120 hours slot reduced to 84 hours for allocated capacity up to 152,000 m3liq) without affecting the duration of the scheduled arrival range as published, considering the operational information available at the time of publication. (2) We inform you that the version of the Regasification Code to be considered is n°15 verified by ARERA with Resolution 281/2024/R/GAS, available at the following link: https://www.arera.it/atti-e-provvedimenti/dettaglio/24/281-24
13/03/2024 Infra-Annual Subscription Process ‐ First Come First Served criteria Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ First Come First Served criteria, pursuant to chapter II article 2.4.2 b) β) of the Regasification Code, the following Spot Capacity Available :
* The volume proposed is not referred to the capacity of the LNG Ship. The Terminal accepts LNG Ships with a minimum capacity equal to 65,000 lcm, as set forth at Chapter II.1.1. of the Regasification Code. For further information please check our Maritime Services dedicated web area.
The applicable tariff for the Regasification Service is available on the Portale Asta, together with the Access Request form available here.
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Capacity Subscription Process- first come first served criteria. Enabled Users to the auction procedures, could make an Offer on Portale Asta.
11/03/2024
Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") in order to maximize the use of the LNG regasification service in the interest of the security of the National energy supply and the Gas Market, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Spot Capacity Available :
* The volume proposed is not referred to the capacity of the LNG Ship. The Terminal accepts LNG Ships with a minimum capacity equal to 65,000 lcm, as set forth at Chapter II.1.1. of the Regasification Code. For further information please check our Maritime Services dedicated web area.
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta
24/01/2024
Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") in order to maximize the use of the LNG regasification service in the interest of the security of the National energy supply and the Gas Market, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta
23/01/2024 Infra-Annual Subscription Process ‐ First Come First Served criteria Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") after receiving a Release Declaration makes available for subscription during the Infra-Annual Subscription Process ‐ First Come First Served criteria, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code, the following Foundation released capacity:
The applicable tariff is available here. The Access Request form is available here and has to be upload on Portale Asta This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Capacity Subscription Process- first come first served criteria.
(1) In order to optimize the utilization of the Terminal Capacity, it is understood that in case of allocation of a volume lower than the maximum available volume offered in the auction procedure, the Operating Company reserves the possibility of reducing the number of hours of the allocated slot (e.g. 120 hours slot reduced to 84 hours for allocated capacity up to 152,000 m3liq) without affecting the duration of the scheduled arrival range as published, considering the operational information available at the time of publication.
22/01/2024
Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Foundation Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta (1) In order to optimize the utilization of the Terminal Capacity, it is understood that in case of allocation of a volume lower than the maximum available volume offered in the auction procedure, the Operating Company reserves the possibility of reducing the number of hours of the allocated slot (e.g. 120 hours slot reduced to 84 hours for allocated capacity up to 152,000 m3liq) without affecting the duration of the scheduled arrival range as published, considering the operational information available at the time of publication.
28/12/2023
Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta (1) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.
20/12/2023
Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta (1) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.
18/12/2023
Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta (1) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.
14/12/2023
Infra-Annual Subscription Process ‐ First Come First Served criteria Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") after receiving a Release Declaration makes available for subscription during the Infra-Annual Subscription Process ‐ First Come First Served criteria, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code, the following Regulated released capacity:
The applicable tariff is available here. The Access Request form is available here and has to be sent to the following certified e-mail address: terminale.gnl.adriatico_mercato@pec.it This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Capacity Subscription Process- first come first served criteria.
11/12/2023 Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta (1) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.
04/12/2023 Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta (1) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.
27/11/2023 Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta (1) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.
17/11/2023 Infra-Annual Capacity Subscription process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following a release of Regulated Capacity, makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Capacity made Available:
This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. Enabled Users with reference to the auction procedures, could make an Offer on Portale Asta (1) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.
07/09/2023 Publication of Regasification Capacity Availability at Adriatic LNG Terminal as per Chapter II article 2.4.2 a) of the Regasification Code The Open Season 2023 closed with the allocation of all the Incremental Capacity offered till 2045. In consideration of the results of the previous allocation procedures, Adriatic LNG will offer Available Capacity starting from January 2029. Auction Procedures for subscription of Infra-annual Capacity, pursuant to chapter II article 2.4) comma 2 point b) α), of the Regasification Code and of Implementing Auction Rules for Infra-annual Capacity allocation, are suspended up to (i) the eventual release of capacity by a User, if any, (ii) the eventual additional Capacity made available following optimization works subject to operative conditions and relevant authorizations.
The eventual Capacity made available for subscription will be promptly published on the Electronic Communication System. The Terminal Capacity is determined by considering the technical and operational limits of the Terminal, send-out capacity, Storage capacity, and the available pipeline capacity at the Cavarzere Entry Point known at the date of this publication and taking into account the number and duration of Unloading Slots. For more details see Article 2.1 of Chapter II of the Regasification Code. For further clarification do not hesitate to contact us: alng_mercato@adriaticlng.it |
Infra-Annual Subscription TY2022-2023
|
||||||||||
26/07/2023 Adriatic LNG informs that the Released Capacity offered with Infra-Annual Subscription Process ‐ First Come First Served criteria, for Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code, has not been allocated. All the remaining Available Capacity for the current Thermal Year 2023-2024 has been allocated. Then, the allocation procedures are suspended up to (i) the eventual release of capacity by a User, if any, (ii) the eventual Capacity made available following assessment on operating conditions and on planned maintenance activities. The eventual Capacity made available for subscription will be promptly published on the Electronic Communication System and all the operators who have declared an interest for this capacity will be contacted.
25/07/2023 Infra-Annual Subscription Process ‐ First Come First Served criteria Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") after receiving a Release Declaration makes available for subscription during the Infra-Annual Subscription Process ‐ First Come First Served criteria, for Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code, the following Regulated released capacity:
The applicable tariff is available here. The Access Request form is available here and has to be sent to the following certified e-mail address: terminale.gnl.adriatico_mercato@pec.it This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
06/12/2022 Publication of Regasification Capacity Availability at Adriatic LNG Terminal as per Chapter II article 2.4.2 a) of the Regasification Code Following the outstanding results of the Open Season 2022 all the available capacity at Adriatic LNG Terminal until the end od December 2028 has been allocated
Auction Procedures for subscription of Infra-annual Capacity, pursuant to chapter II article 2.4) comma 2 point b) α), of the Regasification Code and of Implementing Auction Rules for Infra-annual Capacity allocation, are suspended up to (i) the eventual release of capacity by a User, if any, (ii) the eventual additional Capacity made available following optimization works subject to operative conditions and relevant authorizations.
The eventual Capacity made available for subscription will be promptly published on the Electronic Communication System. The Terminal Capacity is determined by considering the technical and operational limits of the Terminal, send-out capacity, Storage capacity, and the available pipeline capacity at the Cavarzere Entry Point known at the date of this publication and taking into account the number and duration of Unloading Slots. For more details see Article 2.1 of Chapter II of the Regasification Code.
For further clarification do not hesitate to contact us: alng_mercato@adriaticlng.it
29/04/2022 Adriatic LNG informs that following the success of Infra-Annual Subscription Process ‐ first come first served criteria, the Available Capacity offered, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code, has been allocated. All the remaining Available Capacity for the current Thermal Year has been allocated. Then, the allocation procedures are suspended up to (i) the eventual release of capacity by a User, if any, (ii) the eventual additional Capacity made available following optimization works or (iii) the publication of the Infra-Annual Capacity available for Thermal Year 2022- 2023 after the closure of the long term capacity allocation so-called Open Season 2022 (end July 2022). The eventual Capacity made available for subscription will be promptly published on the Electronic Communication System and all the operators who have declared an interest for this capacity will be contacted
|