Regasification


 

Regasification service offered by Adriatic LNG includes:

  • Berthing of LNG carriers;
  • LNG unloading;
  • Storage of LNG for the time necessary for the redelivery of the gas;
  • Regasification of LNG; and 
  • Redelivery of natural  gas in the national gas pipeline network.

On an annual  basis every year at the latest in the months of June and July, Adriatic LNG offers its capacity for mid- and long-term periods (up to twentyfive years) and, on a weekly basis, the infra-annual capacity (e.g. until the end of the thermal year).

The price of the regasification capacity is defined at the outcome of the auctions for the infra-annual capacity and for the multi-year capacity.

If you want to have an overview on Adriatic LNG regasification service overall costs – including the cost to enter the national network please clink on this link: Tariff Calculator

 

Furthermore, the regasification service gives the possibility to access ancillary flexibility services (Temporary Storage and Flexibility in the redelivery of gas)

29/04/2022

Adriatic LNG informs that following the success of Infra-Annual Subscription Process ‐ first come first served criteria, the Available Capacity offered, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code, has been allocated.
 

All the remaining Available Capacity for the current Thermal Year has been allocated. Then, the allocation procedures are suspended up to (i) the eventual release of capacity by a User, if any, (ii) the eventual additional Capacity made available following optimization works or (iii) the publication of the Infra-Annual Capacity available for Thermal Year 2022- 2023 after the closure of the long term capacity allocation so-called Open Season 2022 (end July 2022).
 

The eventual Capacity made available for subscription will be promptly published on the Electronic Communication System and all the operators who have declared an interest for this capacity will be contacted

 

28/04/2022

Infra-Annual Subscription Process ‐ first come first served criteria

Given the latest updates provided on the arrival of LNG Carriers by the Users of the Regasification service, Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") in order to maximize the use of the LNG regasification service in the interest of the security of the National energy supply and the Gas Market, makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n.

Month

Unloading
Slot

Minimum and Maximun quantity
of LNG (m3liq)

Deadline for the submission of
the Access Request to

terminale.gnl.adriatico_mercato@pec.it

n.1

May 2022

4-6 May

from 65.000 to 100.000 m3liq

29 April 2022 – 5.00PM CET

 

The applicable tariff is available here.

The Access Request form is available here and has to be sent to the following certified e-mail address: terminale.gnl.adriatico_mercato@pec.it

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

01/04/2022

Adriatic LNG informs that following the success of the Available Infra-Annual Capacity allocation process all the remaining Available Capacity for the current Thermal Year has been allocated. Then, the allocation procedures are suspended up to (i) the eventual release of capacity by a User, if any, (ii) the eventual additional Capacity made available following optimization works or (iii) the publication of the Infra-Annual Capacity available for Thermal Year 2022- 2023 after the closure of the long term capacity allocation so-called Open Season 2022 (end July 2022).


The eventual Capacity made available for subscription will be promptly published on the Electronic Communication System and all the operators who have declared an interest for this capacity will be contacted.

 

24/03/2022

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following the full clearance of the authorization to increase LNG regasification capacity from 8 to 9 billion cubic meters of natural gas per year, makes available additional Capacity through the Auction Procedure for the subscription of the Infra-Annual Capacity, according to the Regasification Code chapter II article 2.4) comma 2 point b)α), and the Implementing Auction Rules for Infra-Annual Capacity Allocation . The details of the Available Capacity are as follows:

Slot/Product n. Month and number of slots
in the relevant Month
Start date - End date (and associated arrival date range) Minimum and Maximun quantity of LNG per Slot Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_
mercato@pec.it
Capacity:
Released/
Available
n. 1 June 2022 5-9 June (5-7 June) from 65.000 to 152.000 m3liq(1)
30 March 2022
- 2.30PM CET
Available Capacity

n. 2

July 2022

3-7 July (3-5 July)

from 65.000 to 152.000 m3liq(1)

30 March 2022
- 2.30PM CET
Available Capacity
n. 3 September 2022 25-29 September (25-27 September) from 65.000 to 217.000 m3liq(2)
30 March 2022
- 2.30PM CET
Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

1) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours duration where, in this publication, the available Capacity is up to 152.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

2)Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served.

 

21/02/2022

Adriatic LNG informs that following the success of the Available Infra-Annual Capacity allocation process all the remaining Available Capacity for the current Thermal Year has been allocated. Then, the allocation procedures are suspended up to (i) release of capacity by a User, if any, (ii) additional Capacity made available following current optimization works or (iii) the publication of the Infra-Annual Capacity available for Thermal Year 2022- 2023 after the closure of the long term capacity allocation so-called Open Season 2022 (end July 2022).


The Capacity made available for subscription will be promptly published on the Electronic Communication System and all the operators who have declared an interest for this capacity will be contacted.

 

14/02/2022

Infra-Annual Capacity Subscription process as per Chapter. II of the article 2.4.2 b).

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") following technical optimization related to the maintenance activity scheduled in August 2022, makes available additional Capacity and offers through the Auction Procedure for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Slot/Product n. Month and number of slots
in the relevant Month
Start date - End date (and associated arrival date range)        Minimum and Maximun quantity  of LNG per Slot   Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_
mercato@pec.it
Capacity:
Released/
Available
n. 1 April 2022 28 April – 1 May (28-30 April) from 65.000 to 152.000 m3liq(1)
16 February 2022
- 2.30PM CET
Available Capacity

n. 2

May 2022

22-26 May (22-24 May)

from 65.000 to 152.000 m3liq(1)

16 February 2022
- 2.30PM CET
Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

1) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours duration where, in this publication, the available Capacity is up to 152.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

21/01/2022

Adriatic LNG informs that following the success of the Infra-Annual Capacity Available allocation process all the remaining Available Capacity for the current Thermal Year has been allocated. Then, the allocation procedures are suspended up to (i) release of capacity by a User, if any, (ii) additional Capacity made available following current optimization works or (iii) the publication of the Infra-Annual Capacity available for Thermal Year 2022- 2023 after the closure of the long term capacity allocation so-called Open Season 2022 (end July 2022).

 

The Capacity made available for subscription will be promptly published on the Electronic Communication System and all the operators who have declared an interest for this capacity will be contacted.

 

17/01/2022

Infra-Annual Capacity Subscription process as per Chapter. II of the article 2.4.2 b).

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Slot/Product n. Month and number of slots
in the relevant Month
Start date - End date (and associated arrival date range)        Minimum and Maximun quantity  of LNG per Slot   Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_
mercato@pec.it
Capacity:
Released/
Available

n. 1

 

n. 2

 

 

June 2022
(2 slots)

The dates of the individual Slots have to be chosen from the following:

2 - 5 June (2 - 4 June);​

5 - 9 June (5 - 7 June);

9-12 June (9 - 11 June).

Maximum total volume in the Month: 369.000 m3liq divided into 2 single Slots:

- Slot 2-5 June; Product n.1 : 1 Slot from 65.000 to 217.000 m3liq(1)
 

- Slot 5-9 June; Product n. 2: 1 Slot from 65.000 to 152.000 m3liq(2)

- Slot 9-12 June; Product n. 2: 1 Slot from 65.000 to 152.000 m3liq(2)

19 January 2022
- 2.30PM CET
Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served.

2) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours duration where, in this publication, the available Capacity is up to 152.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

11/01/2022

Infra-Annual Capacity Subscription process as per Chapter. II of the article 2.4.2 b).

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Slot/Product n. Month and number of slots
in the relevant Month
Start date - End date (and associated arrival date range)        Minimum and Maximun quantity  of LNG per Slot   Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_
mercato@pec.it
Capacity:
Released/
Available
n. 1 January 2022 20-23 January (20-22 January) from 65.000 to 152.000 m3liq (2) 
12 January 2022
- 2.30PM CET
Available Capacity

n. 2

 

 

 

May 2022
(1 slot)

 

The date of the individual Slot has to be chosen from the following:

5 - 8 May (5 - 7 May);

22-26 May (22 -24 May ).

- Slot 5-8 Maggio; Product 2:
1 Slot from 65.000 to 152.000 m3liq (2)

- Slot 22-26 Maggio ; Product 2:
1 Slot from 65.000 to 217.000 m3liq (1)

12 January 2022
- 2.30PM CET
Available Capacity

n. 3

 

n. 4

 

n. 5

June 2022
(3 slots)

The dates of the individual Slots have to be chosen from the following:

2 - 5 June (2 - 4 June);​

5 - 9 June (5 - 7 June);

9-12 June (9 - 11 June);

16–19 June (16–18 June).

Maximum total volume in the Month: 521,000 m3liq divided into 3 single Slots:

- Product 3: 1 Slot from 65.000 to 217.000 m3liq (1)

Product 4: 1 Slot from 65.000 to 152.000 m3liq (2) 

Product 5: 1 Slot from 65.000 to 152.000 m3liq (2) 

12 January 2022
- 2.30PM CET
Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served.

2) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours duration where, in this publication, the available Capacity is up to 152.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

03/01/2022

Infra-Annual Capacity Subscription process as per Chapter. II of the article 2.4.2 b).

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:

Slot/Product n. Month and number of slots
in the relevant Month
Start date - End date (and associated arrival date range)        Minimum and Maximun quantity  of LNG per Slot   Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_
mercato@pec.it
Capacity:
Released/
Available
n. 1 January 2022 20-23 January (20-22 January) from 65.000 to 152.000 m3liq (2) 
5 January 2022
- 2.30PM CET
Available Capacity

n. 2

 

n. 3

 

 

May 2022
(2 slots)

 

The dates of the individual Slots have to be chosen from the following:

5 - 8 May (5 - 7 May);

15 - 19 May (15 - 17 May);

22-26 May (22 -24 May ).

Maximum total volume in the Month: 369,000 m3liq divided into 2 single Slots:

- Product 2: 1 Slot from 65.000 to 217.000 m3liq (1)

Product 3: 1 Slot from 65.000 to 152.000 m3liq (2) 

5 January 2022
- 2.30PM CET
Available Capacity

n. 4

 

n. 5

 

n. 6

June 2022
(3 slots)

The dates of the individual Slots have to be chosen from the following:

2 - 5 June (2 - 4 June);​

5 - 9 June (5 - 7 June);

9-12 June (9 - 11 June);

16–19 June (16–18 June).

Maximum total volume in the Month: 521,000 m3liq divided into 3 single Slots:

- Product 4: 1 Slot from 65.000 to 217.000 m3liq (1)

Product 5: 1 Slot from 65.000 to 152.000 m3liq (2) 

Product 6: 1 Slot from 65.000 to 152.000 m3liq (2) 

5 January 2022
- 2.30PM CET
Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served.

2) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours duration where, in this publication, the available Capacity is up to 152.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

30/12/2021

Infra-Annual Capacity Subscription process as per Chapter. II of the article 2.4.2 b).

Following the conclusion of the Annual Subscription Process (the so called “Open Season 2021”) and the finalization of the annual scheduling process, Adriatic LNG makes available through the Auction Procedure for the Subscription of the Infra-Annual Capacity referred to in the Implementing Auction Rules for Infra-Annual Capacity Allocation the following Available Capacity, divided into five (5) Unloading slots that can be purchased individually or jointly: 

Slot/Product n. Month and number of slots
in the relevant Month
Start date - End date (and associated arrival date range)        Minimum and Maximun quantity  of LNG per Slot   Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_
mercato@pec.it
Capacity:
Released/
Available

n. 1

 

n. 2

 

 

May 2022
(2 slots)

 

The dates of the individual Slots have to be chosen from the following:

5 - 8 May (5 - 7 May);

15 - 19 May (15 - 17 May);

22-26 May (22 -24 May ).

Maximum total volume in the Month: 369,000 m3liq divided into 2 single Slots:

- Product 1: 1 Slot from 65.000 to 217.000 m3liq (1)

Product 2: 1 Slot from 65.000 to 152.000 m3liq (2) 

5 January 2022
- 2.30PM CET
Available Capacity

n. 3

 

n. 4

 

n. 5

June 2022
(3 slots)

The dates of the individual Slots have to be chosen from the following:

2 - 5 June (2 - 4 June);​

5 - 9 June (5 - 7 June);

9-12 June (9 - 11 June);

16–19 June (16–18 June).

Maximum total volume in the Month: 521,000 m3liq divided into 3 single Slots:

- Product 3: 1 Slot from 65.000 to 217.000 m3liq (1)

Product 4: 1 Slot from 65.000 to 152.000 m3liq (2) 

Product 5: 1 Slot from 65.000 to 152.000 m3liq (2) 

5 January 2022
- 2.30PM CET
Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served.

2) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours duration where, in this publication, the available Capacity is up to 152.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

27/12/2021

Infra-Annual Capacity Subscription process as per Chapter. II of the article 2.4.2 b).

Following the conclusion of the Annual Subscription Process (the so called “Open Season 2021”) and the finalization of the annual scheduling process, Adriatic LNG makes available through the Auction Procedure for the Subscription of the Infra-Annual Capacity referred to in the Implementing Auction Rules for Infra-Annual Capacity Allocation the following Available Capacity, divided into five (5) Unloading slots that can be purchased individually or jointly: 

Slot/Product n. Month and number of slots
in the relevant Month
Start date - End date (and associated arrival date range)        Minimum and Maximun quantity  of LNG per Slot   Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_
mercato@pec.it
Capacity:
Released/
Available

n. 1

 

n. 2

 

 

May 2022
(2 slots)

 

The dates of the individual Slots have to be chosen from the following:

5 - 8 May (5 - 7 May);

15 - 19 May (15 - 17 May);

22-26 May (22 -24 May ).

Maximum total volume in the Month: 369,000 m3liq divided into 2 single Slots:

- Product 1: 1 Slot from 65.000 to 217.000 m3liq (1)

Product 2: 1 Slot from 65.000 to 152.000 m3liq (2) 

29 December 2021
- 2.30PM CET
Available Capacity

n. 3

 

n. 4

 

n. 5

June 2022
(3 slots)

The dates of the individual Slots have to be chosen from the following:

2 - 5 June (2 - 4 June);​

5 - 9 June (5 - 7 June);

9-12 June (9 - 11 June);

16–19 June (16–18 June).

Maximum total volume in the Month: 521,000 m3liq divided into 3 single Slots:

- Product 3: 1 Slot from 65.000 to 217.000 m3liq (1)

Product 4: 1 Slot from 65.000 to 152.000 m3liq (2) 

Product 5: 1 Slot from 65.000 to 152.000 m3liq (2) 

29 December 2021
- 2.30PM CET
Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served.

2) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours duration where, in this publication, the available Capacity is up to 152.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

20/12/2021

Infra-Annual Capacity Subscription process as per Chapter. II of the article 2.4.2 b).

Following the conclusion of the Annual Subscription Process (the so called “Open Season 2021”) and the finalization of the annual scheduling process, Adriatic LNG makes available through the Auction Procedure for the Subscription of the Infra-Annual Capacity referred to in the Implementing Auction Rules for Infra-Annual Capacity Allocation the following Available Capacity, divided into six (6) Unloading slots that can be purchased individually or jointly: 

Slot/Product n. Month and number of slots
in the relevant Month
Start date - End date (and associated arrival date range)        Minimum and Maximun quantity  of LNG per Slot   Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_
mercato@pec.it
Capacity:
Released/
Available

n. 1

 

n. 2

 

n. 3

May 2022
(3 slots)

 

The dates of the individual Slots have to be chosen from the following:

5 - 8 May (5 - 7 May);

15 - 19 May (15 - 17 May);

22-26 May (22 -24 May );

29 May - 2 June (29 -31 May).

Maximum total volume in the Month: 521,000 m3liq divided into 3 single Slots:

- Product 1: 1 Slot from 65.000 to 217.000 m3liq (1)

Product 2: 1 Slot from 65.000 to 152.000 m3liq (2) 

Product 3: 1 Slot from 65.000 to 152.000 m3liq (2) 

22 December 2021
- 2.30PM CET
Available Capacity

n. 4

 

n. 5

 

n. 6

June 2022
(3 slots)

The dates of the individual Slots have to be chosen from the following:

2 - 5 June (2 - 4 June);​

5 - 9 June (5 - 7 June);

9-12 June (9 - 11 June);

16–19 June (16–18 June).

Maximum total volume in the Month: 521,000 m3liq divided into 3 single Slots:

- Product 4: 1 Slot from 65.000 to 217.000 m3liq (1)

Product 5: 1 Slot from 65.000 to 152.000 m3liq (2) 

Product 6: 1 Slot from 65.000 to 152.000 m3liq (2) 

22 December 2021
- 2.30PM CET
Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served.

2) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours duration where, in this publication, the available Capacity is up to 152.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

10/12/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 15 December 2021 - 2.30PM CET Available Capacity
n. 2 February  2022 One Slot from the following
13-17 February;
24-27 February.
13-15 February;
24-26 February.
from 65.000 to 217.000m3liq 15 December 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

 

 

03/12/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 9 December 2021 - 2.30PM CET Available Capacity
n. 2 February  2022 One Slot from the following
13-17 February;
24-27 February.
13-15 February;
24-26 February.
from 65.000 to 217.000m3liq 9 December 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

 

 

25/11/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 1 December 2021 - 2.30PM CET Available Capacity
n. 2 February  2022 One Slot from the following
13-17 February;
24-27 February.
13-15 February;
24-26 February.
from 65.000 to 217.000m3liq 1 December 2021 - 2.30PM CET Available Capacity
n. 3 March 2022 One Slot from the following
13-17 March;
31 March-3 April.
13-15 March;
31 March-2 April.
from 65.000 to 217.000m3liq 1 December 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

 

 

18/11/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 24 November 2021 - 2.30PM CET Available Capacity
n. 2 February  2022 One Slot from the following
13-17 February;
24-27 February.
13-15 February;
24-26 February.
from 65.000 to 217.000m3liq 24 November 2021 - 2.30PM CET Available Capacity
n. 3 March 20223

To be determined2

To be determined2 from 65.000 to 217.000m3liq 24 November 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period of March 2022 will be defined starting from the month of December 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

At the latest, in January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

Infra-Annual Subscription Process ‐ first come first served criteria

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 December 2021 2-5 December 2-4 December from 65.000 to 145.000 m3liq 24 November 2021 - 5.00 PM CET Available Capacity

The applicable tariff is available here.

This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.

 

 

16/11/2021

Following the completion of the Delivery plan for February 2022, on 15th  November 2021, Adriatic LNG updates the publication of the available slots.

 

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 December 2021 2-5 December 2-4 December from 65.000 to 175.0004-5 m3liq 17 November 2021 - 2.30PM CET Available Capacity
n. 2 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 17 November 2021 - 2.30PM CET Available Capacity
n. 3 February  2022 One Slot from the following
13-17 February;
24-27 February.
13-15 February;
24-26 February.
from 65.000 to 217.000m3liq 17 November 2021 - 2.30PM CET Available Capacity
n. 4 March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 17 November 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period of March 2022 will be defined starting from the month of December 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

At the latest, in January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

12/11/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 December 2021 2-5 December 2-4 December from 65.000 to 175.0004-5 m3liq 17 November 2021 - 2.30PM CET Available Capacity
n. 2 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 17 November 2021 - 2.30PM CET Available Capacity
n. 3 February  20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 17 November 2021 - 2.30PM CET Available Capacity
n. 4 March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 17 November 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period February-March 2022 will be defined starting from the month of November 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

At the latest, in January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

05/11/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 December 2021 2-5 December 2-4 December from 65.000 to 175.0004-5 m3liq 10 November 2021 - 2.30PM CET Available Capacity
n. 2 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 10 November 2021 - 2.30PM CET Available Capacity
n. 3 February  20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 10 November 2021 - 2.30PM CET Available Capacity
n. 4 March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 10 November 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period February-March 2022 will be defined starting from the month of November 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

At the latest, in January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

28/10/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 December 2021 2-5 December 2-4 December from 65.000 to 175.0004-5 m3liq 3 November 2021 - 2.30PM CET Available Capacity
n. 2 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 3 November 2021 - 2.30PM CET Available Capacity
n. 3 February  20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 3 November 2021 - 2.30PM CET Available Capacity
n. 4 March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 3 November 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period February-March 2022 will be defined starting from the month of November 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

At the latest, in January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

21/10/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 December 2021 2-5 December 2-4 December from 65.000 to 175.0004-5 m3liq 27 October 2021 - 2.30PM CET Available Capacity
n. 2 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 27 October 2021 - 2.30PM CET Available Capacity
n. 3 February  20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 27 October 2021 - 2.30PM CET Available Capacity
n. 4 March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 27 October 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period February-March 2022 will be defined starting from the month of November 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

At the latest, in January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

21/10/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available through the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 December 2021 2-5 December 2-4 December from 65.000 to 175.0004-5 m3liq 27 October 2021 - 2.30PM CET Available Capacity
n. 2 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 27 October 2021 - 2.30PM CET Available Capacity
n. 3 February  20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 27 October 2021 - 2.30PM CET Available Capacity
n. 4 March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 27 October 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, to formulate an Offer, it will be necessary to send via PEC the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period February-March 2022 will be defined starting from the month of November 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

At the latest, in January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

18/10/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 20  October 2021 - 2.30PM CET Available Capacity
n. 2 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 20  October 2021 - 2.30PM CET Available Capacity
n. 3 January 2022 One Slot from the following
2 - 6 January;
​9 - 13 January;
20-23 January.
2 - 4 January;
9 - 11 January;
20 - 22 January.
from 65.000 to 217.000m3liq 20  October 2021 - 2.30PM CET Available Capacity
n. 4  February 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 20  October 2021 - 2.30PM CET Available Capacity
n. 5  March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 20  October 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

07/10/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 13 October 2021 - 2.30PM CET Available Capacity
n. 2 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 13 October 2021 - 2.30PM CET Available Capacity
n. 3 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 13 October 2021 - 2.30PM CET Available Capacity
n. 4 and n. 5 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 175.0004-5 m3liq 13 October 2021 - 2.30PM CET Available Capacity
n. 6 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 152.0005 m3liq 13 October 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

01/10/2021

Infra-Annual Capacity Subscription process

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Implementing Auction Rules for Infra-Annual Capacity Allocation and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following  Available Capacity1:

Product n. Month Unloading
Slot
Scheduled
Arrival
range
Minimum and Maximun quantity
of LNG (m3liq)
Deadline for the submission of
the Offer Form to
terminale.gnl.adriatico_mercato@pec.it
Capacity:
Released/Available
n. 1 October 2021 27-30 October 27-29 October from 65.000 to 152.0005 m3liq 6 October 2021 - 2.30PM CET Available Capacity
n. 2 December 2021 2-5 December 2-4 December from 65.000 to 152.0005 m3liq 6 October 2021 - 2.30PM CET Available Capacity
n. 3 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 217.000m3liq 6 October 2021 - 2.30PM CET Available Capacity
n. 4 and n. 5 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 175.0004-5 m3liq 6 October 2021 - 2.30PM CET Available Capacity
n. 6 Period January - March 20223 To be determined2 To be determined2 from 65.000 to 152.0005 m3liq 6 October 2021 - 2.30PM CET Available Capacity

 

This publication in conjunction with conditions published under the Regasification Code and the Implementing Auction Rules for Infra-Annual Capacity Allocation, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.

With reference to the auction procedure, it will be necessary to use the MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).

 

1) The Available Capacity for the Thermal Year 2021-2022 starting from 1 (first) April 2022 will be subject to Annual Subscription Procedure, so-called Open Season , pursuant to Chapter II of Article 2.4.2 a).

2) The definition of the products is carried out following the finalization of the Annual Delivery Plan referred to in Chapter II, art. 3.2 of the Regasification Code.

3) The start and end dates of each Unloading Slot in the period January-March 2022 will be defined starting from the month of October 2021, in the context of the Quarterly Planning referred to in Chapter II article 3.3 of the Regasification Code.

In January 2022 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code,  the Annual Plan will be finalized for the period April-December 2022.

As an example: In the month of October 2021 the Terminal Users program the Slots for the quarter November 2021-January 2022. Afterwards, in the month of November 2021 the Terminal Users program the Slots for the quarter December 2021-February 2022 and in the month of December 2021 the Users of the Terminal program the Slots for the quarter January-March 2022.

The distribution of the Slots within the Quarterly and Annual Planning, favors the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article 3.1 of Chapter II of the Regasification Code.

4) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, volumes up to 152.000m3liq, are not binding for the subsequent allocation according to the criteria of first come first served .

5) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217.000 m3liq in Slot of 84hours and/or 96hours duration where, in this publication, the available Capacity is up to 145.000 m3liq, 152.000m3liq or 175.000m3liq) in consideration of the operating conditions at the time of publication of the Available Capacity.

 

 

SCHEDULE OF UNLOADING SLOTS


30/08/2022

Adriatic LNG, informs that thanks to a further optimization related to the planned shutdown for maintenance,  the normal operating conditions with a gas redelivery equal to 20 Mln SCM will resume on August 31st at 03:00 pm approximately.

 

This notice is based on the information available to date, any update will be published in due time.

This notice is an announcement of scheduled unavailability pursuant to Implementing Regulation (EU) no. 1348/2014 of 17 December 2014 (Implementing Regulation) and Regulation (EU) no. 1227/2011 of the European Parliament and of the Council, of 25 October 2011, concerning the integrity and transparency of the wholesale energy market.

 

26/08/2022

Adriatic LNG, updates the data related to the planned shutdown for maintenance with total or partial unavailability of the regasification capacity:
- on 28th August 2022 the capacity is limited to 21,9 Mln SCM.
- starting from 29th August no limitation to the regasification capacity is provided;
- from September 1st normal operating conditions will restart.

No other changes are foreseen with respect to the program reported in the note published on 18 July 2022.
 

This notice is based on the information available to date, any update will be published in due time.

This notice is an announcement of scheduled unavailability pursuant to Implementing Regulation (EU) no. 1348/2014 of 17 December 2014 (Implementing Regulation) and Regulation (EU) no. 1227/2011 of the European Parliament and of the Council, of 25 October 2011, concerning the integrity and transparency of the wholesale energy market.

 

 

28/07/2022

Adriatic LNG, updates the data related to the planned shutdown for maintenance with total or partial unavailability of the regasification capacity: on 29 July 2022 the available capacity is limited to 5 Mln SCM. No other changes are foreseen with respect to the program reported in the note published on 18 July 2022.
 

This notice is based on the information available to date, any update will be published in due time.

This notice is an announcement of scheduled unavailability pursuant to Implementing Regulation (EU) no. 1348/2014 of 17 December 2014 (Implementing Regulation) and Regulation (EU) no. 1227/2011 of the European Parliament and of the Council, of 25 October 2011, concerning the integrity and transparency of the wholesale energy market.

 

18/07/2022

Adriatic LNG, with regards to the communication published on 15 June 2021, updates data relating to plant shutdown scheduled for maintenance with total or partial unavailability of the regasification capacity:

  • 28 July 2022 : capacity limited to 21,9 Mln SCM ;
  • 29 July 2022 : capacity limited to 9 Mln SCM ;
  • 30 July al 26 August : shut down;
  • 27 August : capacity limited to 6 Mln SCM;
  • 28 August : capacity limited to 16 Mln SCM;
  • 29 August : capacity limited to 21,9 Mln SCM.

From August 30th normal operating conditions will restart.

This notice is based on the information available to date, any update will be published in due time.

This notice is an announcement of scheduled unavailability pursuant to Implementing Regulation (EU) no. 1348/2014 of 17 December 2014 (Implementing Regulation) and Regulation (EU) no. 1227/2011 of the European Parliament and of the Council, of 25 October 2011, concerning the integrity and transparency of the wholesale energy market.

 

11/02/2022

Adriatic LNG informs that, due to a delay in the arrival of the LNG carrier of a User, the planned production of the terminal, considering the latest developments on the LNG carrier arrival, will have reductions from gas days 12th February to gas days 15th February. The impact is estimated in the order of approximately 130,900 MWh on gas day 12th February, 174,900 MWh on gas day 13th February, 174,900 MWh on gas day 14th February and 64,900 MWh on gas day 15th February.
Adriatic LNG will continue to monitor the issue and communicate any available updates.

 

15/11/2021

Schedule of unloading slots: annual communication provided by the Operating Company pursuant to Article 3, Chapter II of the Regasification Code.

The calendar displays the unloading slots allocated and available for subscription in the year 2022, pursuant to Article 3, Chapter II of the Regasification Code.

Without prejudice to further optimization or technical assessments pursuant to the Regulation and the Regasification Code, unloading slot duration and timing are subject to the completion of the annual delivery plan according to the Regasification Code chapter II article 3.2.3.

 

 

 

 

KEY:

Scheduling in progress
 

Subscribed Capacity
 

Released Capacity

 

 
 

Available Capacity
 

Not available Capacity

 

 

 

 

RULES AND PROCEDURE FOR THE SUBSCRIPTION OF THE INFRANNUAL CAPACITY


How to become a user of the regasification service through the subscription procedure for the Infra-annual capacity

 

First of all, we are at your disposal to explain Our offer and the access rules to Our services, please contact us:
 

  • E-mail address: alng_mercato@adriaticlng.it
  • Lisa Roncon : +39.338.7298766, lisa.roncon@adriaticlng.it;
  • Simona D'Angelosante : +39.345.7990399, simona.dangelosante@adriaticlng.it

The available capacity for subscription is published on Adriatic LNG website
The main way of allocating the infra-annual capacity is by auction.

The infra-annul capacity not allocated through auction that satisfies the criteria to qualify as Spot Capacity is allocated according to the first come first served criteria at the tariff published on the Adriatic LNG website.

Please note that the User of the Infra-annual Capacity can also have access to the Flexibility Service by participating in the corresponding allocation process.

 

I. Auction Procedure for Infra-annual capacity subscription

There are 3 steps:

 

1) Any interested party in participating at the Infra-Annual allocation capacity procedure has to satisfy the following participation requirements according to the Regasification Code as adopted in article 4 of the Implementing Auction Rules for Infra-Annual Capacity allocation (“Implementing Auction Rules”) following the conditions there indicated and deliver to the Operating Company: i. The Form of Commitments signed by the legal representative; and ii. Bid Bond

2) The reserve prices of the capacity offered in the context of the auctions procedures for the subscription of the Infra-Annual Capacity are defined, as appropriate (i) by the Operating Company and delivered to a public notary before the auction takes place or (ii) by the User that makes the capacity available according to the criteria defined at comma 1 of article 7 letters b) or c) of the TIRG 

 

3) Transmission of the offers

a) Auction offers must be sent to the Operating Company to the certified email (PEC) terminale.gnl.adriatico_mercato@pec.it using the Offer Form from hours 10.30 to hours 14.30 CET of the day of the auction.

The auction calendar for each Year is published and updated by Adriatic LNG on its website.

b) The Offer sent to the Operating Company is binding, unconditional, irrevocable and valid until 18.00 of the fourth (4th) Working Day following the day of the auction to which the Auction Offer is referred.

 

4) Results and signature of the Capacity Agreement

a) By 5.00 pm of the Day of the Auction, the Operating Company informs each Participant of the results of the session in which a purchase offer was made, in accordance with the provisions of the Regasification Code and The Implementing Auction Rules for Infra-Annual Capacity allocation.

b) Following the allocation of the Unloading Slots, according to the criteria defined in the Regasification Code and Implementing Auction Rules, the successful bidder will send to the Operating Company within 2 Working Days from the closure of the auction procedure (i) the Regulated Capacity Contract or the Spot Capacity Contract according to the cases, duly signed and (ii) the guarantees referred to in Article 10 of Chapter III of the Regasification Code.

The delivery will take place by sending the documentation to the PEC address terminale.gnl.adriatico_mercato@pec.it and must be signed by a legal representative.

The digital submission must be followed by the original sending of the guarantee.

The contents of the Access Request, the allocation criteria and the Access Conditions are provided in the applicable legislation and in the Regasification Code. The Regasification Code is an integral part of the Capacity Agreement. The Regasification Code verified by the Regulatory Authority for Energy, Networks and the Environment with Resolution no. Arg / Gas 57/11 and subsequent updates is available at the following link: Regasification Code of the Adriatic LNG Terminal.

 

 

II. Allocation of the Infra – Annual Capacity through the first come first served criteria.

 

If, at the end of the auction procedure, all the Spot Capacity has not been allocated, the Operating Company makes available for subscription and allocates the Available Spot Capacity according to the temporal order of receipt of the Access Requests (“first come first served").
 

1) Prices of the Spot Capacity offered in the context of the “first come first served” procedure as per comma 6 of article 6 of TIRG are published by the Operating Company on the Electronic Communication System, according to comma 7 of article 6 of the TIRG.

 

2) Access Requests for the Spot Capacity will be sent to the Operating Company to the PEC address terminale.gnl.adriatico_mercato@pec.it, every day from 8.00 to 17.00 starting from the day following the closing day of the auction Procedure and up to the 5th (fifth) Working Day before the Scheduled Arrival Range of each Unloading Slot for the Spot Capacity. All documentation sent to the Operating Company via PEC must be signed using a Qualified Electronic Signature Certificate (FEQ) in PADES format or, alternatively, another similar tool and suitable for meeting the same requirements that will be assessed by the Operating Company at its unquestionable judgment.

 

3) The Access Requests will be binding, irrevocable and unconditional until 17.01 CET on the second Working Day following the transmission of the documentation via PEC, pursuant to the Regasification Code.

 

4) The Operating Company will notify the Applicants of the results including any acceptance within 17.00 CET on the day following the day of receipt of the Access Request. Following the Acceptance of the Access Request, the successful bidder will send to the Operating Company to the PEC address terminale.gnl.adriatico_mercato@pec.it no later than 2 (two) Working Days the Spot Capacity Contract duly signed by a legal representative and the guarantees referred to in article 10 of the chapter III of the Regasification Code. The digital submission must be followed by the original sending of the guarantee.

 

Link:
Auction Rules
Auction Calendar
Forms –Procedure for the Subscription of the Infra-Annual Capacity

 

Suspended Calendar

GUIDELINES & CLARIFICATIONS

01/07/2022

(Non binding English version)

Deviation in excess on contractual / scheduled / discharged volumes –for Thermal Year 2022/2023

Adriatic LNG provides that, similarly to the provisions for Spot Users (ref. Chap. III art. 8.12.1 letter b) of the Regasification Code) and to maximize the utilization of the Available Capacity, a deviation in excess of the volume of LNG per Slot subscribed may be allowed by the Operating Company to Continuous Users under conditions.

Interested Users are invited to contact us at the following address: alng_mercato@adriaticlng.it

 

1) Foreseeable deviations and timing for the request:

1.1)  Deviation up to 10 (ten)% of the volume of LNG subscribed of a single Slot ("Deviation 10%"), shall be requested by the User at the latest by the fifth (5) business day prior to the start of the Unloading Slot.

1.2) Deviation of more than 10 (ten)% of the volume of LNG subscribed of a single Slot ("Extra Deviation") shall be requested by the User no later than the 16th (sixteen) day of the Month preceding the Month of Unloading.

 

2) Conditions:
The conditions to be met to grant the Deviation 10% or the Extra Deviation are:

  • no effects on the Subscribed Capacity and / or Redelivery of other Users; and / or
  • no effects on the Flexibility Service subscribed by the Users of the Flexibility Service; and / or
  • compatibility with the safe and reliable Terminal operations; and / or
  • compliance with the Regulations.

The Operating Company will assess whether or not the aforementioned conditions are satisfied and will provide feedback to the User.

 

3) Charges:

3.1) Deviation 10%, the following charges apply:

a) on the contractual quantity of LNG: the allocation price;

b) on the quantity of LNG (lcm) exceeding the contractual quantity of LNG within the limit of 10%: the allocation price.

The charges a) and b) will be invoiced without prejudice to the other costs provided for in the Regasification Code.

The reference volume for the purpose of determining the charge will be the greater value between the last scheduled quantity of LNG per article 3.3 of Chapter II of the Regasification Code and the quantity of LNG unloaded.

3.2) Extra Deviation, the following charges apply cumulatively:

a) on the contractual quantity of LNG: the allocation price;

b) on the quantity of LNG (lcm) exceeding the contractual quantity of LNG: the allocation price + 10 (ten)% of the cqs fee approved by ARERA and published by the Operating Company, for example:

 

  • From January 1st, 2022 to December 31st, 2022 : 2,628 €/m3 GNL;
  • From January 1st, 2023 to December 31st, 2023 : 2,012 €/m3 GNL.

c) opportunity cost of the unavailability and allocation costs of the Flexibility Service (valued from time to time, communicated by the Operating Company to the User at the time of  the feedback on the request for an Extra Deviation and applied to all Users in the same conditions) within the limits of the maximum tariff for the ancillary service.

 

4) Technical deviation in excess:

Pursuant to the Regasification Code, the User shall provide a schedule that is the best estimate in good faith of the quantity of LNG that will be actually Unloaded no later than the 16th (sixteenth) day of the Month preceding the Month of Unloading.

4.1) During the Unloading phase, a technical deviation up to a maximum value of 3 (three)% will be allowed, applicable to the last scheduled volume of LNG per article 3.3 of Chapter II of the Regasification Code, if compatible with the technical requirements of the Terminal ("Technical deviation") and must be duly and promptly justified by the User. The Unloading of a quantity of LNG higher than the Technical deviation shall be requested by the User per points 1.1 or 1.2 above and is not permitted without the positive feedback of the Operating Company

4.2) A User who has been allowed a Deviation 10% and unloads LNG beyond the threshold of the Technical deviation must pay the charges provided for the Extra Deviation on the whole quantity in excess from the last scheduled quantity per article 3.3 of Chapter II of the Regasification Code without prejudice to the other costs referred to in the Regasification Code

 

The terms referred to in this communication have the meaning attributed to them in the Regasification Code.

 

18/03/2022

 

The LNG regasification capacity increases from 8 to 9 billion Smc / Year of natural gas.

Adriatic LNG has been authorized to increase LNG regasification capacity from 8 to 9 billion cubic meters of natural gas per year.

The Ministry of Ecological Transition - with Decree 4 issued on March 15, 2022 - verified the compliance with the environmental conditions of the Directorial Decree of exclusion from the VIA no. 297 of 18 August 2021.

The increase in LNG regasification capacity is done with the optimization of operating conditions, without any structural changes compared to the current operational structure.

 

13/01/2022

(Non binding English version)

Guidelines – Infra - Annual auctions - deadline for delivery of offers

We remind our kind potential customers that, pursuant to the Implementing Auction Rules for the allocation of the Infra-Annual Capacity, the delivery deadline for the offers is 2.30 pm C.E.T. on the day of the auction. Pursuant to article 4.2 last § of the same rules “(…), to determine the exact date and time of the delivery of the documentation to the Operating Company, the "download date" on the PEC platform of the Operating Company will be taken as evidence." (bold added). Therefore, given that the time between the sending of the offers and their download by the PEC is not under the control of Adriatic LNG, potential customers (and in particular those who do not have a certified email so-called PEC for sending) are invited not to wait the last deadline for submitting their offers. It is recommended to send the offers at the latest at 2.20 pm C.E.T.