Regasification
Regasification service offered by Adriatic LNG includes:
- Availability of terminal capacity
- Berthing of LNG carriers
- LNG unloading
- Storage
- Redelivery of regasified LNG at Cavarzere, entry point into the Italian National Grid.
Every year during the months of June and July, Adriatic LNG offers its capacity for mid- and long-term periods (up to ten years) and, on a monthly basis, the infra-annual capacity (e.g. until the end of the thermal year).
Check -out tariffs for regasification service for the period concerned.
29/09/2020
Infra-Annual Subscripion process
Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
Product n. | Month of the year 2020/ Period of the year 2021 |
Unloading Slot |
Scheduled Arrival range |
Minimum and Maximun quantity of LNG (m3liq) |
Deadline for the submission of the Offer Form to terminale.gnl.adriatico_mercato@pec.it |
Capacity: Released/Available |
---|---|---|---|---|---|---|
n.1 | December | 11-14 December | 11-13 December | from 65.000 to 217.000 m3liq1 | 5 October 2020 - 2.30PM CET | Available Capacity |
n. 2 | December | 23-26 December | 23-25 December | from 65.000 to 145.000 m3liq | 5 October 2020 - 2.30PM CET | Available Capacity |
from n.3 to n.8 | Period January-September 2021 | To be determined2 | To be determined2 | 6 Slots from 65.000 to 145.000 m3liq3 | 5 October 2020 - 2.30PM CET | Available Capacity |
from n.09 to n.14 | Period January-September 2021 | To be determined2 | To be determined2 | 6 Slots from 65.000 to 217.000 m3liq1 | 5 October 2020 - 2.30PM CET | Available Capacity |
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity.
With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).
(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation.
(2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code.
In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021.
As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021.
The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code.
(3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.
Infra-Annual Subscription TY2019-2020
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
21/09/2020 Infra-Annual Subscripion process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).
(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code. In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021. As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021. The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code. (3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.
14/09/2020 Infra-Annual Subscripion process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).
(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code. In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021. As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021. The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code. (3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.
07/09/2020 Infra-Annual Subscripion process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s).
(1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code. In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021. As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021. The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code. (3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.
28/08/2020 Infra-Annual Subscripion process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s). (1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code. In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021. As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021. The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code. (3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.
19/08/2020 Infra-Annual Subscripion process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s). (1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code. In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021. As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021. The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code. (3) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.
Infra-Annual Subscription Process ‐ first come first served criteria Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:
(1) Released exempted RTPA Capacity The applicable tariff is available here. This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
12/08/2020 Infra-Annual Subscripion process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s). (1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) Released exempted RTPA Capacity (3) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code. In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021. As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021. The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code. (4) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.
06/08/2020 Infra-Annual Subscripion process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. With Reference to the auction procedure, it will be necessary to use the new MODULO DI OFFERTA UNICO where indicate the Unloading Slot/(s) you intend to make an Offer/(s). (1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) Released exempted RTPA Capacity (3) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code. In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021. As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021. The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code. (4) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.
Infra-Annual Subscription Process ‐ first come first served criteria Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:
The applicable tariff is available here. This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
29/07/2020 Infra-Annual Subscripion process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. With Reference to the auction procedure, it will be necessary to send 1 (one) Offer Form for each Unloading Slot you intend to make an Offer. (1) Volumes defined in order to maximize the utilization of Available Capacity and defined following reasonable analyzes of operating conditions of the Terminal, at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) Released exempted RTPA Capacity (3) The start and end dates of each Unloading Slot in the period January-September 2021 will be defined starting from the month of October 2020, in the context of the Quarterly Planning referred to in Chapter II article.3.3 of the Regasification Code. In January 2021 - based on the provisions of the Annual Plan referred to in Chapter II, article 3.2 of the Regasification Code- the Annual Plan will be finalized for the period April-December 2021. As an example: In the month of October 2020 the Terminal Users program the Slots for the quarter November 2020-January 2021. Afterwards, in the month of November 2020 the Terminal Users program the Slots for the quarter December 2020-February 2021 and in the month of December 2020 the Users of the Terminal program the Slots for the quarter January-March 2021. The distribution of the Slots within the Quarterly and Annual Planning, favours the regularity of the deliveries by each User and the maximization of the utilization of the Terminal Capacity, in compliance with the criterion of non-discrimination of the Users, in accordance with the provisions of the article 10.4 of the TIRG implemented by the article. 3.1 of Chapter II of the Regasification Code. (4) In order to optimize the utilization of the Terminal Capacity, it is understood that for the Unloading Slots available (i.e. unallocated) in the next auction procedures, the Operating Company reserves the possibility of increasing the Available Capacity (e.g. up to 217,000 m3 liq in 4 Days Slot where, in this publication, the available Capacity is up to 145,000 m3 liq.) in consideration of the operating conditions at the time of publication of the Available Capacity.
21/07/2020 Infra-Annual Subscripion process Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available during the Auction Procedure, for the subscription of the Infra-Annual Capacity, according to the Temporary Auction Rules and to the Regasification Code, chapter II article 2.4) comma 2 point b) α), the following Available Capacity:
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. (1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) Released exempted RTPA Capacity
14/07/2020
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. (1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) Released exempted RTPA Capacity
07/07/2020
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. (1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) Released exempted RTPA Capacity
16/06/2020
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. (1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation. (2) Released exempted RTPA Capacity
11/05/2020
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. (1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation.
21/4/2020
The applicable tariff is available here. This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/04/2020
This publication in conjunction with conditions published under the Temporary Auction Rules and the Regassification Code, are an integral and substantial part of the capacity offer under the Auction Procedure, for the subscription of the Infra-Annual Capacity. (1) Volumes defined following reasonable analyzes of operating conditions at the time of publication. For clarity, they are not binding for the first come first served allocation.
21/03/2020
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/03/2020
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
21/02/2020
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/02/2020
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
18/01/2020
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
21/1/2019
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/12/2019
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
18/11/2019
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
18/10/2019
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Infra-Annual Subscription TY2018-2019
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18/9/2019
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code.
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
18/8/2019
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code. (**) Indicative number of Unloading Slots. Furthermore, without prejudice to the provisions of article 3(4) of Chapter II of the Regasification Code, relating to the T.Y. 2019/2020, the number of Unloading Slots and/or Terminal Capacity in 2020 summer period could be reduced in order to allow the execution of scheduled maintenance activities and/or foreseen by the applicable legislation.
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
18/5/2019
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
18/4/2019
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
18/3/2019
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
18/2/2019
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
21/1/2019
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/1/2019
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
18/12/2018
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
20/11/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/11/2018
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
22/10/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/10/2018
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code. This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
20/09/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Infra-Annual Subscription TY2017-2018
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18/09/2018
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
20/08/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/08/2018 Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ Auction Procedure, the following Available Capacity, pursuant to chapter II article 2.4) comma 2 point b) α) of the Regasification Code:
(*)To be determined based on conditions of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
20/07/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/07/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
20/06/2018 Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ first come first served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- first come first served criteria.
18/06/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
22/05/2018 Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") makes available for subscription during the Infra-Annual Subscription Process ‐ First Come First Served criteria, the following Spot Capacity, pursuant to chapter II article 2.4) comma 2 point b) β) of the Regasification Code:
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- First Come First Served criteria.
18/05/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
20/04/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Spot Capacity Subscription Process- First Come First Served criteria.
18/04/2018
This publication in conjunction with conditions published under Rules are an integral and substantial part of the capacity offer under the Infra-Annual Subscription Process- Auction Procedure.
20/03/2018 Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") make available for subscription during the Infra-Annual Subscription Process ‐ First Phase, the following Available Capacity:
This publication in conjunction with conditions published under Rules/tariffs are an integral and substantial part of the capacity offer under the Infraannual Subscription process. A copy of the publications above must be signed by the legal representative of the Applicant and be delivered in conjunction with the Access Request.
16/03/2018 Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") make available for subscription during the Infra-Annual Subscription Process ‐ First Phase, the following Available Capacity:
This publication in conjunction with conditions published under Rules/tariffs are an integral and substantial part of the capacity offer under the Infraannual Subscription process. A copy of the publications above must be signed by the legal representative of the Applicant and be delivered in conjunction with the Access Request. |
SCHEDULE OF UNLOADING SLOTS
30/07/2020
Adriatic LNG informs that considering the relaxation of the restrictions in place with lockdown due to the Covid-19 pandemic, the restarting of various production activities is allowed with the relative availability of contractors, including international ones, to provide several maintenance activities on the off shore terminal. These activities will be always carried out in full compliance with the safety measures provided for by current legislation.
The maintenance plan scheduled for August 2020 has been consequently updated. It foresees a shut down period with zero send out from 4rd to 14th of August and a reduction of the available capacity to 2 Slots (i.e additional Slots unavailable in August vs last publication: 17-20 and 25-28 August 2020, equal to a total unavailable capacity in August of 580.000m3 liq, or approximately 354 million Sm3. The following Slot is available: 13-16 August 2020.
News published |
14/07/2020 Adriatic LNG informs that considering the relaxation of the restrictions in place with lockdown due to the Covid-19 pandemic, the restarting of various production activities is allowed with the relative availability of contractors, including international ones, to provide several maintenance activities on the off shore terminal. These activities will be always carried out in full compliance with the safety measures provided for by current legislation. The maintenance plan scheduled for August 2020 has been consequently updated. It foresees a shut down period with zero send out from 3rd to 12th of August and a reduction of the available capacity to 2 Slots (i.e additional Slots unavailable in August vs last publication: 17-20 and 25-28 August 2020, equal to a total unavailable capacity in August of 580.000m3 liq, or approximately 354 million Sm3. The following Slots are available: 13-16 and 21-23 August 2020.
03/06/2020 Adriatic LNG informs that considering the current restrictions due to the Covid-19 pandemic and the initiatives aimed at mitigating the risk of spreading the epidemic on the offshore platform, the maintenance plan scheduled for August 2020 has been updated. The updated maintenance plan does not provide for a plant shutdown and has a limited effect on the regasification capacity by reducing the available capacity to 4 Slots in August 2020 (ie Slots unavailable 5-8 August and 9-12 August 2020, equal to a capacity unavailable of 290.000m3 liq, about 177 million Sm3). This communication has to be considered an announcement of planned unavailability pursuant to Implementing Regulation (EU) no. 1348/2014 of 17 December 2014 (Implementing Regulation) in application of Regulation (EU) no. 1227/2011 of the European Parliament and of the Council of 25 October 2011 concerning the integrity and transparency of the wholesale energy market. Without further information updates, the application of other relevant regulations is reserved.
11/05/2020 Adriatic LNG informs that considering the current restrictions due to the Covid-19 pandemic and the initiatives aimed at mitigating the risk of spreading the epidemic on the offshore platform, the maintenance plan scheduled for August 2020 has been updated. The updated maintenance plan does not provide for a plant shutdown and has a limited effect on the regasification capacity by reducing the available capacity to 4 Slots in August 2020 (ie Slots unavailable 9-12 August and 17-20 August 2020, equal to a capacity unavailable of 290.000m3 liq, about 177 million Sm3). This communication has to be considered an announcement of planned unavailability pursuant to Implementing Regulation (EU) no. 1348/2014 of 17 December 2014 (Implementing Regulation) in application of Regulation (EU) no. 1227/2011 of the European Parliament and of the Council of 25 October 2011 concerning the integrity and transparency of the wholesale energy market. Without further information updates, the application of other relevant regulations is reserved.
14/01/2020 The calendar displays the unloading slots allocated and available for subscription in the year 2020 (pursuant to Article 3, Chapter II of the Regasification Code).
15/11/2019 In the period 5-24 August 2020 a plant shutdown is scheduled for maintenance with total unavailability of the regasification capacity. This communication has to be considered an announcement of scheduled unavailability in accordance with the Implementing Regulation (EU) n. 1348/2014 of 17 December 2014 (Implementing Regulation) in application of Regulation (EU) no. 1227/2011 of the European Parliament and of the Council, of 25 October 2011, concerning the integrity and transparency of the wholesale energy market. The application of other relevant regulations is reserved. |
KEY:
Subscribed Capacity
Released Capacity
Available Capacity
Not available Capacity
Assignment of unloading slots takes place during the quarterly scheduling process.
RULES AND PROCEDURE FOR THE SUBSCRIPTION OF THE INFRANNUAL CAPACITY
How to became a user of the regasification service for the Infra-annual procedure
First of all, we are at your disposal to explain the access rules: please contact us at the following mobile numbers Roberta Pirotta (+39.334.8886276), Lisa Roncon (+39.338.7298766) or write us on
alng_mercato@adriaticlng.it
There are two ways to allocate the infra-annual capacity, first by auction, second – only for SPOT capacity – by first come first served criteria.
The available capacity for subscription is published on our Electronic Communication System
I. Auction Procedure for Infra-annual capacity subscription
There are 3 steps:
1) Any interested party in partecipating at the Infra-Annual allocation capacity procedure has to satisfy the following participation requirements according to article 4 of the Temporary Auction Rules followings the conditions there indicated and deliver to the Operating Company: i. The Form of Commitments signed by the legal representative; and ii. Bid Bond |
---|
2) the reserve prices of the capacity offered in the context of the auctions procedures for the subscription
of the Infra-Annual Capacity are defined, as appropriate (i) by the Operating Company or (ii) by the User
that makes the capacity available according the criteria defined at comma 1 of article 7 letters b) or c) of
the TIRG.
3) Transmission of the offers a) Purchasing offers must be sent to the Operating Company to the certified email (PEC) terminale.gnl.adriatico_mercato@pec.it using the Offer Form from hours 10.30 to hours 14.30 of the day of the auction. The auction calendar for each Year is published and updated by Adriatic LNG on its website. b) The Offer sent to the Operating Company is binding, unconditional, irrevocable and valid until 18.00 of the fourth (4th) Working Day following the day of the auction to which the Auction Offer is referred. Pursuant to the Temporary Auction Rules, the Offer sent to the Operating Company is final and binding for the purposes of the obligations under the Regasification Code. |
---|
4) Results and signature of the Capacity Agreement a) By 5.00 pm of the Day of the Auction the Operating Company informs each Participant of the results of the session in which made a purchase offer in accordance with the provisions of the Temporary Auction Rules and the Regasification Code. b) Following the allocation of the Unloading Slots, according to the criteria defined in the Temporary Auction Rules, the successful bidder will send to the Operating Company within 2 Working Days from the closure of the auction procedure (i) the Regulated Capacity Contract or the Spot Capacity Contract according to the cases, duly signed and (ii) the guarantees referred to in Article 10 of Chapter III of the Regasification Code. The delivery will take place by sending the documentation to the PEC address terminale.gnl.adriatico_mercato@pec.it and must be signed by a legal representative. The digital submission must be followed by the original sending of the guarantee. |
---|
The contents of the Access Request, the allocation criteria and the Access Conditions are provided in the applicable legislation and in the Regasification Code. The Regasification Code is an integral part of the Capacity Agreement. The Regasification Code approved by the Regulatory Authority for Energy, Networks and the Environment with Resolution no. Arg / Gas 57/11 and subsequent updates is available at the following link: Regasification Code of the Adriatic LNG Terminal.
II. Allocation of the Infra – Annual Capacity through the first come first served criteria.
If, at the end of the auction procedure, all the Spot Capacity has not been allocated, the Operating Company makes available for subscription and allocates the Available Spot Capacity according to the temporal order of receipt of the Access Requests (“first come first served").
1) Prices of the Spot Capacity offered in the context of the “first come first served” procedure as per comma 6 of article 6 of TIRG are published by the Operating Company on the Electronic Communication System, according to comma 7 of article 6 of the TIRG.
2) Access Requests for the Spot Capacity will be sent to the Operating Company to the PEC address terminale.gnl.adriatico_mercato@pec.it, every day from 8.00 to 17.00 starting from the day following the closing day of the auction procedure and up to the 5th (fifth) Working Day before the Scheduled Arrival Range of each Unloading Slot for the Spot Capacity. All documentation sent to the Operating Company via PEC must be signed using a Qualified Electronic Signature Certificate (FEQ) in PADES format or, alternatively, another similar tool and suitable for meeting the same requirements that will be assessed by the Operating Company at its unquestionable judgment.
3) The Access Requests will be binding, irrevocable and unconditional until 17.01 CET on the second Working Day following the transmission of the documentation via PEC, pursuant to the Regasification Code.
4) The Operating Company will notify the Applicants of the results including any acceptance within 17.00 CET on the day following the day of receipt of the Access Request. Following the Acceptance of the Access Request, the successful bidder will send to the Operating Company to the PEC address terminale.gnl.adriatico_mercato@pec.it no later than 2 (two) Working Days the Spot Capacity Contract duly signed by a legal representative and the guarantees referred to in article 10 of the chapter III of the Regasification Code. The digital submission must be followed by the original sending of the guarantee.
Link:
Auction Rules
Auction Calendar
Forms –Procedure for the Subscription of the Infra-Annual Capacity
Temporary Auction Rules _ tracked changes version
02/07/2020
Annual Subscription Process for the period of Thermal Year 2020/2021 to Thermal Year 2029/2030 inclusive - Update July 2nd 2020: Conclusion of Annual Subscription Process.
- Courtesy English Translation (not binding – only the Italian version is binding) –
Adriatic LNG hasn’t received any access request by the deadline of 17:00 CET Wednesday July 1st 2020 for the Annual Capacity Subscription process. The allocation procedure of the following Available Capacity will be opened within the Infra-Annual Subscription Process starting from August 2020.
Thermal Year (TY) | Number of Unloading Slots | Month | Period of slot discharge |
---|---|---|---|
2020/2021 | 1 | November | 9-12 November 2020 |
2020/2021 | 2 | December | 11-14 December 2020 23-26 December 2020 |
2020/2021 | 15 | Period January - September 2021 | To be determined (*) |
(*)To be determined based on estimates of Chapter II, Section 3.2 – Annual Scheduling of the Regasification Code
29/05/2020
Publication of the Terminal regasification Capacity in accordance with the Article 2.4.2. a) of Chapter II of the Regasification Code
According to the Article 2.4.2 a) of Chapter II of the Regasification Code, Adriatic LNG publishes the Terminal regasification Capacity.
The Terminal Capacity is determined by considering the technical and operational limits of the Terminal, Storage capacity, send-out capacity and the available pipeline capacity at the Cavarzere Entry Point known at the date of this publication and taking into account the number and duration of Unloading Slots.
For more details see Article 2.1 of Chapter II of the Regasification Code.
Related Documents
Courtesy English Translation (not binding – only the Italian version is binding)
Annual Subscription Process for the period of Thermal Year 2020/2021 to Thermal Year 2029/2030 inclusive – Rules for the Annual Subscription Process of Available Regasification Capacity in accordance with Article 8.7 of the Resolution of the Regulatory Authority for Energy, Networks and Environment No 168/06 and Article 2.4.2 of Chapter II of the Regasification Code.
With reference to the regasification Capacity of the Terminal published on this website on 29/05/2020 Adriatic LNG offers, under the Annual Subscription Process, Available Regulated Capacity for the period of Thermal Year 2020/2021 to Thermal Year 2029/2030 inclusive.
Access Requests shall be sent to Adriatic LNG by no later than 17:00 C.E.T. of 1st (first) July 2020.
For more information or clarifications, please contact us at the following mobile numbers Roberta Pirotta (+39.334.8886276), Lisa Roncon (+39.338.7298766) or write us on alng_mercato@adriaticlng.it
Annual Subscription Process for the period of Thermal Year 2020/2021 to Thermal Year 2029/2030 inclusive – Terminal regasification Capacity
Rules for the Annual Subscription Process of Available Regasification Capacity in accordance with Article 8.7 of the Resolution of the Regulatory Authority for Energy, Networks and Environment No 168/06 and Article 2.4.2 a) of Chapter II of the Regasification Code.
Related documents