Loading...
adriaticlng_ rigassificazione_servizi_terminale

regasification


Regasification service offered by Adriatic LNG includes:

  • Availability of terminal capacity
  • Mooring of LNG carriers
  • LNG unloading
  • Storage
  • Redelivery of corresponding LNG units in Cavarzere, admittance point of the national network.

Every year during the months of June and July, Adriatic LNG offers its capacity for mid- and long-term periods (up to ten years) and on a monthly basis with infra-annual capacity (until the end of current thermal year, which is September 30th, 2017).
Check pricing for regasification service for the period concerned.

24 May 2016


Publication of the Terminal regasification Capacity in accordance with the Article 2.4.2. of Chapter II of the Regasification Code.


According to the Article 2.4.2  of Chapter II of the Regasification Code, Adriatic LNG publishes the Terminal regasification Capacity.


The Terminal Capacity is determined by considering the technical and operational limits of the Terminal and taking into account the number and duration of Unloading Slots, Storage capacity, send-out capacity and the available pipeline capacity at the Cavarzere Entry Point.


For more details see Article 2.1 of Chapter II of the Regasification Code.

 

TERMINAL REGASIFICATION CAPACITY

Period: 10 Thermal Years


1 T.Y. from 1° October 2016 to 30 September 2017
Terminal Regasification Capacity (a)
m3 of LNG (1) Mta (1) N° of slot (2)
13.093.290 5,76 92
Not Available for Subscription (b)
Subscribed Exempted Capacity
Subscribed Regulated Capacity
10.094.455 4,44 71
1.680.000 0,74 12
Available for Subscription (c = a - b)
Unsubscribed Exempted Capacity(3)
Released Exempted Capacity (4)
Unsubscribed Regulated Capacity
Released Regulated Capacity
Total Capacity Available for Subscription
105.944 0,05 1
274.234 0,13 2
938.658 0,41 6
- - -
1.318.835 0,59 9
2 T.Y. from 1° October 2017 to 30 September 2019
Terminal Regasification Capacity (a)
m3 of LNG (1) Mta (1) N° of slot (2)
13.093.290 5,76 92
Not Available for Subscription (b)
Subscribed Exempted Capacity
Subscribed Regulated Capacity
10.368.688 4,56 73
1.680.000 0,74 12
Available for Subscription (c = a - b)
Unsubscribed Exempted Capacity(3)
Released Exempted Capacity (4)
Unsubscribed Regulated Capacity
Released Regulated Capacity
Total Capacity Available for Subscription
105.944 0,05 1
- - -
938.658 0,41 6
- - -
1.044.601 0,46 7
1 T.Y. from 1° October 2019 to 30 September 2020
Terminal Regasification Capacity (a)
m3 of LNG (1) Mta (1) N° of slot (2)
13.093.290 5,76 92
Not Available for Subscription (b)
Subscribed Exempted Capacity
Subscribed Regulated Capacity
10.368.688 4,56 74
427.000 0,19 3
Available for Subscription (c = a - b)
Unsubscribed Exempted Capacity(3)
Released Exempted Capacity (4)
Unsubscribed Regulated Capacity
Released Regulated Capacity
Total Capacity Available for Subscription
105.944 0,05 1
- - -
2.191.658 0,96 15 (5)
- - -
2.297.601 1,01 16
6 T.Y. from 1° October 2020 to 30 September 2026
Terminal Regasification Capacity (a)
m3 of LNG (1) Mta (1) N° of slot (2)
13.093.290 5,76 92
Not Available for Subscription (b)
Subscribed Exempted Capacity
Subscribed Regulated Capacity
10.368.688 4,56 73
- - -
Available for Subscription (c = a - b)
Unsubscribed Exempted Capacity (3)
Released Exempted Capacity (4)
Unsubscribed Regulated Capacity
Released Regulated Capacity
Total Capacity Available for Subscription
105.944 0.05 1
- - -
2.618.658 1,15 18 (5)
- - -
2.724.601 1,20 19

(1) Liquid to gas coefficient, density value and gross calorific value are based on historical / contractual data
(2)Indicative number of Unloading Slots
(3) Unsubscribed Exempted Capacity reclassified as Unsubscribed Regulated Capacity for the purpose of the Annual Subscription Process according to the Regasification Code chapt. II par. 2.4.2
(4) Released Exempted Capacity reclassified as Released Regulated Capacity for the purpose of the Annua l Subscription Process according to the Regasification Code chapt. II par. 2.4.2
(5) Following the expiry of a Contract for Regulated Capacity, the following additional Slots are avail able starting from 2020, on top of the Slots available in the period October 2015 -

  • 9 addtional Slots for each T.Y. are available starting from January 2020
  • 3 addtional Slots for each T.Y. are available starting from October 2020

 

04 July 2016

Annual Subscription Process for the period of Thermal Year 2016/2017 to Thermal Year 2026/2027 inclusive - Update July 4th 2016: Conclusion of Annual Subscription Process.
- Courtesy English Translation (not binding – only the Italian version is binding) –


Adriatic LNG has received no requests by the deadline of 17:00 CET Wednesday July 1st 2016 for the Annual Capacity Subscription process.


The allocation procedure of the following Available Capacity will be opened within the Monthly Capacity Subscription process starting from July 22nd , 2016 at 17:00 CET.

Thermal Year (TY) Number of Unloading Slots Month Period of slot discharge
2016/2017 1 September 2016 16 - 19 September
2016/2017 1 October 2016 13 - 16 October
2016/2017 1 October 2016 21 - 24 October
2016/2017 1 November 2016 14 - 17 November
2016/2017 1 December 2016 27 – 30 December
2016/2017 4 Period January-September 2017 To be defined (*)

(*)To be determined based on estimates of Chapter II, Section 3.2 - Annual Scheduling of the Regasification Code

 

24 May 2016

Annual Subscription Process for the period of Thermal Year 2016/2017 to Thermal Year 2025/2026 inclusive – Rules for the Annual Subscription Process of Available Regasification Capacity in accordance with Article 8.7 of the Resolution of the Authority for Electricity and Gas No 168/06 and Article 2.4.2 of Chapter II of the Regasification Code.
- Courtesy English Translation (not binding – only the Italian version is binding) –
With reference to the regasification Capacity of the Terminal published on this website on May 24th, 2016 en > Business > Regasification service > THERMAL YEAR 2016 2017 > Regasification capacity Adriatic LNG offers, under the Annual Subscription Process, Available Regulated Capacity for the period of Thermal Year 2016/2017 to Thermal Year 2025/2026 inclusive.

Access Requests should be sent to ALNG by no later than 17:00 C.E.T. of 1st (first) July 2016.

For more information or clarifications, please contact:
Dr.ssa Roberta Pirotta, Tel.: +39.02.63698569, Email : roberta.pirotta@adriaticlng.it
Ing. Dahm Gazzola Riccardo, Tel.: + 39.02.63698572, Email : riccardo.dahm.gazzola@adriaticlng.it

Annual Subscription Process for the period of Thermal Year 2016/2017 to Thermal Year 2025/2026 inclusive – Terminal regasification Capacity

Rules for the Annual Subscription Process of Available Regasification Capacity in accordance with Article 8.7 of the Resolution of the Authority for Electricity and Gas No 168/06 and Article 2.4.2 of Chapter II of the Regasification Code.

 

 

21 Aug 2017

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") make available for subscription during the Infra-Annual Subscription Process ‐ Second Phase (“first come first served”), the following Available Capacity:

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Access
Request
Capacity:
Released/Available
spot August-September 30 August - 1 September 30 – 31 August 145.000 23 August 2017 Available
continuous December 7 – 10 December 7- 8 December 145.000 15 September 2017 Available
continuous January-September 2018 to be defined to be defined 5 x 145.000 15 September 2017 Available
This publication in conjunction with conditions published under Rules/tariffs are an integral and substantial part of the capacity offer under the Infraannual Subscription process. A copy of the publications above must be signed by the legal representative of the Applicant and be delivered in conjunction with the Access Request.

 


18 Aug 2017

Terminale GNL Adriatico ("the Operating Company" or "Adriatic LNG") make available for subscription during the Infra‐Annual Subscription Process - First Phase, the following Available Capacity:

Service type Month Unloading
Slot Period
Scheduled
Arrival
range
Volume
of LNG
(Liquid
m3)
Deadline for the
submission of
the Access
Request
Capacity:
Released/Available
spot August-September 30 August - 1 September 30 – 31 August 145.000 20 August 2017 Available
continuous December 7 – 10 December 7- 8 December 145.000 20 August 2017 Available
continuous January-September 2018 to be defined to be defined 5 x 145.000 20 August 2017 Available

This publication in conjunction with conditions published under Rules/tariffs are an integral and substantial part of the capacity offer under the Infra‐annual Subscription process. A copy of the publications above must be signed by the legal representative of the Applicant and be delivered in conjunction with the Access Request.

15 May 2015

SCHEDULE OF UNLOADING SLOTS


The calendar displays the unloading slots allocated and available for subscription in the year 2017 (pursuant to Article 3, Chapter II of the Regasification Code).

KEY:

Subscribed Capacity

Available Capacity

 

1) Assignment of unloading slots takes place during the quarterly scheduling process.

1) Terminale GNL Adriatico (the "Operating Company" or "Adriatic LNG") makes available for subscription the following Available Capacity, as published on the Electronic Communication System.
The publication of the Infra-Annual Capacity Subscription Process must be signed by the legal representative of the Applicant and be delivered in conjunction with the Access Request.


2) The applicable tariff by the Operating Company is the Regasification and Metering Tariffs in force for the relevant period, as published on the Adriatic LNG website and herein attached (“Annex Tariff”).

From January 1st 2016 to December 31st 2016 Tariff 2016

From January 1 2017 to December 31st 2017 Tariff 2017

Annex Tariff 2016 Acrobat

Annex Tariff 2017 Acrobat

The above attachment shall be signed by the legal representative of the Applicant and delivered together with the Access Request.


3) The are one or potentially two phases of the Infra-Annual Capacity allocation process.

First phase
The Access Requests must be sent to Adriatic LNG by registered mail or fax by and not later than 17:00 CET of the “deadline” as of point v) lett. (e) comma  3 of the Article 2 Chapter II of the Regasification Code at the following address:


Terminale GNL Adriatico S.r.l
Piazza S. Freud 1
20154 Milano (MI), Italy
Fax +39.02.44386377
Infra-Annual Capacity allocation process– first phase


4) If the access request is sent by fax, the original documentation shall be sent in due time by registered mail or hand delivered no later than the 17:00 CET the following business day from the deadline pain of inadmissibility of the request.


5) The request is binding, irrevocable and unconditional up to 17:01 CET of the working day following the Deadline.


6) The Operating Company undertakes to notify Applicants of the results (acceptance or reject) with reference to each Access Request by 17.00 CET of the Day 20th  of each Month.


7)  Instructions for Access Requests, Allocation Criteria and Access Conditions are provided in the applicable rules and in the Regasification Code. The Regasification Code is an integral part of the Capacity Agreement.

8) The Regasification Code approved by the Authority for the electricity gas and water system with Resolution Arg/Gas n. 57/11 and the following updates is available at the following link: Codice di Rigassificazione di Terminale GNL Adriatico.


9) The provisions of this publication are an integral and substantial part of the Infra-Annual Capacity Subscription offer. Copy of this publication, in the form attached, must be signed by the Legal Representative of the Applicant and be delivered in conjunction with the Access Request. Infra-Annual Capacity Subscription Process - TY 2016/2017 – Rules/tariffs Acrobat.

Second phase: first come first served.


1. If by the Deadline all the Infra-Annual Capacity has not been allocated, the Operating Company will assign the Available Capacity in accordance with the “first come first served" rules.


In this case, Access Requests shall be sent by registered mail or fax on business days following the Deadline from 8.30 to 17.00 C.E.T. up to:
• 5th Working Day prior to the Scheduled Arrival Range of each Unloading Slot, for the Spot Capacity; and
• 15th Day of the Month following the publication of the Infra-Annual Capacity, for the Continuous Capacity.

The Access Requests must be sent to Adriatic LNG at the following address:
Terminale GNL Adriatico S.r.l
Piazza S. Freud 1
20154 Milano (MI), Italy
Fax +39.02.44386377
Infra-Annual Capacity Subscription Process – Second phase


2. If the access request is sent by fax, the original documentation shall be sent in due time by registered mail or hand delivered no later than the 17:00 CET the following business day from the deadline pain of inadmissibility of the request


3. The request is binding , irrevocable and unconditional up to 17:01 CET of the 2nd working day following the delivery date of the Access Request


4. The Operating Company undertakes to notify Applicants of the results (acceptance) by 17.00 CET of the working day following the delivery date of the Access Request.


5. Instructions for Access Requests and Access Conditions are provided in the applicable rules and in the Regasification Code. The Regasification Code is an integral part of the Capacity Agreement.


6. The Regasification Code approved by the Authority for the electricity gas and water system with Resolution Arg/Gas n. 57/11 and the following updates is available at the following link: Codice di Rigassificazione di Terminale GNL Adriatico.


7. The provisions of this publication are an integral and substantial part of the Infra-Annual Capacity Subscription offer. Copy of this publication, in the form attached, must be signed by the Legal Representative of the Applicant and be delivered in conjunction with the Access Request. Infra-Annual Capacity Subscription Process - TY 2016/2017 – Rules/tariffs Acrobat