Regasification Service
05/10/2017
Percentage to cover losses and consumptions of the regasification terminal (QCP component) for the period from October to December 2017
Effective October 1st 2017, the QCP component is valued at 0.75% until December 31st 2017.
The Authority for electricity gas and water system has given its approval to the request for adjustment of the component QCP advanced by Terminale GNL Adriatico S.r.l in consideration of the increased number of cargoes arrived at the Terminal compared to the previously estimated number, which resulted in an increased fuel consumption vs. the one initially estimated and communicated to the Authority and to the market.
27/12/2016
Percentage to cover losses and consumptions of the regasification terminal (QCP component) for the year 2017
Effective January 1st 2017, the QCP component is valued at 0.4% until December 31st 2017.
The Authority for electricity gas and water system has approved this adjustment of the component with the resolution 777/2016/R/gas.
Numerical example tariff 2017_update
19/07/2016
(courtesy translation only)
Tariff for Regasification and Metering Services for Continuous and Spot Users for 2017
The maximum tariffs, calculated on the basis of the criteria established by the Resolution 438/2013/R/Gas, have been approved by the Authority for Electricity, Gas and Water with Resolution 392/2016/R/GAS.
Terminale GNL Adriatico publishes the tariffs for regasification and metering services for Continuous and Spot Users for the use of the Terminal for the period January 1, 2017 through December 31, 2017.
The Commitment Unit Charge | Cqs (euro/cm liquid) | 27,375779 |
Transitional unit charge for the gas transfer measurement service | CMR (euro/cm liquid) | 0,263512 |
Fee-in-kind to cover losses and consumptions for the Terminal Users | QCP (for each delivered cubic meter of LNG) | 0,7% |
Terms used in this publication have the meaning set out in Article 1.1 of Chapter 1 of the Regasification Code approved by the Authority for Electricity and Gas through Resolution ARG/gas 57/11.
Without prejudice to the Regasification Service contracts in force, subject to the maximum tariff established by AEEGSI and to non-discriminatory and transparency obligations under the applicable law, such tariff may be modified by Terminale GNL Adriatico.
Please direct any questions regarding the regasification tariff contact:
Ing. Riccardo Dahm Gazzola
Telefono: +39 0263698572
Fax: +39 02 44386377
E-mail: mailto:riccardo.dahm.gazzola@adriaticlng.it