2018

• In winter, as gas consumption increases due to cold temperatures, the terminal approaches 100% of its rated capacity; on March 1, 27.5 million cubic meters of gas are supplied, which is the highest daily send-out in Adriatic LNG’s history. At the end of the year, annual gas send-out into the national gas pipeline network exceeds 6.5 billion cubic meters. 

• In November, the first LNG cargo from Angola arrives at the terminal. 

 

Operational results  
Carriers offloaded 77
Gas cm sent out into the national grid 6.5 billion
Allocation rate of the ragasification capacity 81%
Reliability rate 99.6%