2012
![](/wps/wcm/connect/0b67f2ae-8de3-422f-aa6a-a64a9a97676b/storia+2012.jpg?MOD=AJPERES&CACHEID=ROOTWORKSPACE-0b67f2ae-8de3-422f-aa6a-a64a9a97676b-mboUZ6A)
• In April the 200th LNG carrier arrives at the terminal.
• The priority of ensuring a safe workplace is strengthened through the implementation of the new accidents prevention system based on behaviors (Loss Prevention System - LPS) that is combined with another management system already in use, called SHEMS (Safety, Security, Health and Environmental Management System), which manages risks concerning health, safety and the environment.
Operational results | |
---|---|
Carriers offloaded | 70 |
Gas cubic meters delivered to the national grid | 5.9 billion |
Terminal utilization rate | 74% |
Reliability rate | 99.9% |