Regasification Service
07/07/2021
The following rates for Regasification services, in force for 2022, have been calculated according to the criteria defined by Resolution 474/2020/R/Gas and approved by ARERA under Resolution 268/2021/R/Gas1),2).
The Cqs unit fee referred to in the following table is applicable to the infra-annual capacity allocated on a first come first served basis. The Cqs of the Subscribed Regulated Capacity according to the auction procedures referred to in Article 2.4 of Chapter II of the Regasification Code is defined at the end of the auction procedure.
Contracted price per unit of volume of LNG | Cqs (euro/liquid mc) | 26,278680 |
Percentage share to cover the consumption and losses incurred by the terminal User | QCP (per liquid mc delivered) |
0,43% Starting from October 1st 2021 |
Emission Trading fee | CETS(euro/liquid mc/year) | 0,355957 |
For an overview of the total cost of Adriatic LNG Regasification Service - including the entry cost into the national grid - please, click on the following link: Tariff Calculator
Contacts for further information.
1)The Cqs fee may be modified by Adriatic LNG in compliance with the criteria established by ARERA, the obligations of transparency and non-discrimination and without prejudice to the contracts for the Regasification Service already signed.
2)The terms referred to in this publication have the meaning set out in Article 1.1 of Chapter 1 of the Regasification Code.
21/05/2021
It is clarified that for the Thermal Year 2020-2021 the Bimonthly Redelivery Program Charge, so-called "CBOUltra" referred to in Article 8.1.1 letter c) of Chapter III of the Regasification Code, is not applied.
06/07/2020
The following rates for regasification services, in effect for 2021, have been calculated according to the criteria defined by Resolution 474/2020/R/Gas and approved by the Italian Regulatory Authority for Energy, Networks and Environment (ARERA) under Resolution 229/2020/R/Gas1),2 1),2).
Contracted price per unit of volume of LNG | Cqs (euro/liquid mc) | 25,525556 |
Percentage share to cover the consumption and losses incurred by the terminal user | QCP (per liquid mc delivered) | 0,64% |
Emission Trading fee | CETS(euro/liquid mc/year) | 0,188338 |
Contacts for further information.
21/02/2020
The following rates for regasification services, in effect for 2020, have been calculated according to the criteria defined by Resolution 474/2020/R/Gas and approved by the Italian Regulatory Authority for Energy, Networks and Environment (ARERA) under Resolution 43/2020/R/Gas 1),2).
Contracted price per unit of volume of LNG | Cqs (euro/liquid mc) | 27,883633 |
Percentage share to cover the consumption and losses incurred by the terminal user | QCP (per liquid mc delivered) |
January/September: 0.63% October/December 2020:0.65% |
Emission Trading fee | CETS(euro/liquid mc/year) |
0,134078 starting from 1st October 2020 |
Contacts for further information.
______________________________________________________________________________________________________________________________________
If you want to have an overview on Adriatic LNG regasification service overall costs – including the cost to enter the national network please clink on this link: Tariff Calculator
1) The applicable rate may be modified by Adriatic LNG in compliance with the criteria defined by the Italian Regulatory Authority for Energy, Networks and Environment (ARERA), respectful of the obligation of transparency and non-discrimination and without prejudice to regasification contracts already signed.
2) The terms set forth in this publication are defined in Article 1.1 of Chapter 1 of the Regasification Code.